Views:

Summary

DPX can change the retention time of multiple jobs at the same time by following the below steps in the DPX Management Console.

 

Question

How do I change the retention time in DPX for multiple jobs at the same time?

 

Answer

In order to change the retention time for multiple jobs do the following 
- Select the instances that require a new retention time set, by Control-Click
- In the Menu Bar Select the entry CatalogedJob | Change Retention 

 

 


- Acknowledge the pop for editing multiple job instances per selecting "Yes"

- Enter the new required retention time 

- Select OK.